Scorpion82
ACCESS: Secret
- Joined
- 20 May 2006
- Messages
- 203
- Reaction score
- 377
Strake testing, proto AMK kit
That's the original XP1 strakes, not the AMK which was tested on IPA7, comprising ewfined LEX, delta strakes and enlarged flaperons.
Strake testing, proto AMK kit
Yes, I said proto AMK as the report goes into some of the reasons for those changes.That's the original XP1 strakes, not the AMK which was tested on IPA7, comprising ewfined LEX, delta strakes and enlarged flaperons.
I wonder how many two-seaters in the Italian order, and more importantly whether they will have ECRS.Mk 2 radar?
Based on previous statement from Eurofighter CEO, Giancarlo Mezzanatto, these additional Italian jets will on delivery be a unique hybrid of Tranche 4+ and the ECRS Mk 0 E-Scan radar, based on Italy's urgent requirement. https://t.co/nnvJVahw90
— Gareth Jennings (@GarethJennings3) December 23, 2024
*Takes a bow* https://t.co/flsZvgqgI8 pic.twitter.com/IyfBA9iZ78
— Gareth Jennings (@GarethJennings3) December 23, 2024
Anyone want to place bets on that Turkish EF deal also being announced in the next 24hrs....? #avgeek pic.twitter.com/DtAlipHiMk
— Tim Robinson (@RAeSTimR) December 23, 2024
First of all I want to see the original signature of the German Federal Office for Economic Affairs and Export Control on white paper, then we can talk about any agreements. I have no taste for any understanding or memorandum, hand shake, provisional signatures etc... https://t.co/ZfghrBTdWe
— Harun Reşit Aydin (@HarunMedium) December 23, 2024
I think it was just the DA7 manual?
I think it was just the DA7 manual?
There are a DA7 and Tranche 1 Avonics manual that have been online since the mid 2000s. I’m not sure if it’s them though.DA7 as in Development Aircraft 7? If that's the case this is one of the Typhoon prototypes from the late 1990s, its' avionics are out of date.
Most of WT leaks were just documents available online, which just happens to look too technical for dumb layman for it to not be a "confidential document" in their opinion. There were only very few actual leaks, such as that of Challenger, but this time, it was again just a nothingburger.I think it was just the DA7 manual?
Unlocking collective strength 💪
— Lockheed Martin UK (@LMUKNews) December 19, 2024
Click to discover how we've equipped @NATO and our European allies to advance 21st Century Security® technologies and solutions ⬇️
It was the DA7 manual, which is NATO Restricted according to the Italian MoD. It's been "leaked" about three times now. That being said, it is available online.
I wonder how many two-seaters in the Italian order, and more importantly whether they will have ECRS.Mk 2 radar?
Some additional info on the #Italy follow-on buy of 24 @eurofighter. From EF, will comprise 22 single- and 2 twin-seaters to be delivered from 2029 at P3Ec standard (or P4E if timelines align). Although previously told will be ECRS Mk 0 radar, now told 'still to be confirmed'... https://t.co/nnvJVahw90 pic.twitter.com/wAQBx2k3JL
— Gareth Jennings (@GarethJennings3) January 10, 2025
And get it while its hot off the press, Italy has signed for 24 x Eurofighter Typhoons to replace their Tranche 1 airframes
View attachment 753430
Italy has signed a contract for up to 24 Eurofighter Typhoon jets, following last week’s Spanish order for 25 aircraft.
This milestone marks another significant step in the Eurofighter programme and the modernisation of European air defence.![]()
The new Typhoons will replace Italy’s Tranche 1 jets, ensuring their Air Force continues to benefit from the latest technology and cutting-edge operational capabilities.
Giancarlo Mezzanatto, CEO of Eurofighter, commented:
“During the past seven days, we have seen two of the four Eurofighter Core Nations sign new contract orders, with a clear desire to modernise their Air Forces and confirming the crucial role they attribute to our aircraft.”
Together, these contracts reinforce Eurofighter’s position as Europe’s largest defence programme, ensuring advanced capabilities and long-term security for partner nations.
#E
Spain orders another 25
![]()
Spain orders 25 additional Eurofighter aircraft
Spanish government signs contract with NATO Eurofighter and Tornado Management Agency (NETMA) for 25 Eurofighter aircraft.www.airbus.com
View attachment 753069
View attachment 753070
cheers
Update on both points from Gareth Jennings...
2 of the 24 are 2 seaters and radar is now unclear...would have thought with a 2029 delivery date it would have had its choice of any of the radars...
Radar integration requires more than just the radar itself! ECRS Mk1 & 2 integration is slated for P4E. If P4E isn't ready in time, than the Italians can delay or opt for an earlier standard, with associated consequences in the long term. A decision needs to be made in a timely manner as there are various interdependencies.
Not quite. ECRS.Mk 1 integration is part of P3EB and P3EC. ECRS.Mk 2 sits outside the Phase Enhancements, having slipped from P3EC.
Twitter:
When Eurofighter & NETMA signed for up to 24 new Italian Air Force Eurofighters on 23 December, we complained that: “The announcement lacked any detail as to the breakdown of single & two-seaters."Now we can reveal the numbers!
@Aero_GlobalNews
https://aerospaceglobalnews.com/news/more-details-of-italys-tranche-1-typhoon-replacement/
![]()
Targeting pod and its pylon detach from RAF Typhoon and fall into Yorkshire field
Targeting pod and its pylon detach from RAF Typhoon and fall into a field field in Haisthorpe, near Bridlington, in East Yorkshiretheaviationgeekclub.com
What is going on with aircraft maintainers these days?
That's not what EF GmbH are saying. Step 0 is in P3EB, Step 1 in P3EC.That's only true for the Mk1 Step 0, which is a Mk0 with new TRMs and that's it. The Step 1 with new multi-channel receiver is slated for P4E like Mk2, not least due to the new CRI and TBM. The former is a prerequisite for the later to keep all radar variants going. Mk1 Step 0 is essentially the P3Ec Step 1 contract, it adds the Mk1 Step 0 to the fournational P3Eb2 basline, which differs in a number of ways from the P3Eb1 for Kuwait and its derivate for Qatar.
That's not what EF GmbH are saying. Step 0 is in P3EB, Step 1 in P3EC.
Earlier today, a Royal Air Force Typhoon lost its cockpit canopy in a bird strike over the North Sea.
— OSINTtechnical (@Osinttechnical) January 23, 2025
The pilot managed to nurse his newly convertible fighter back to base.
pic.twitter.com/CJXClOtYSE