paralay
ACCESS: Top Secret
054
The first copy with a full set of equipment. Pre-production (Butowski). Sukhoi Design Bureau indicates that the aircraft is equipped with a more complete avionics composition. Rolling out according to the 2011 plan (17.06.2010, Poghosyan).
in operation: since 2012 (12 years 10 months)
The first copy with a full set of equipment. Pre-production (Butowski). Sukhoi Design Bureau indicates that the aircraft is equipped with a more complete avionics composition. Rolling out according to the 2011 plan (17.06.2010, Poghosyan).
in operation: since 2012 (12 years 10 months)