Wait, how about Australia adopting a non-nuclear variant of the Suffren, before going nuclear ?
...
Nope, forgot that.

According to Turnbull this was actually an option.

The deal required that at least the first two boats be conventionally powered but allowed for a switch to an "Australianized" Suffren, nuclear powered boat along with a reduced total buy (8 rather than 12).

just catching up to all this, so Australia is insistent on it being nuclear..
besides the Suffren and Virginia, was the Astute considered/offered?

Australia's "insistence" on nuclear-powered subs was premised on a step change of defence focus from defence of Australia's littoral to operations anywhere in the world (in the first instance, in the South China Sea).
 
So what about the Suffren design? Well it was offered informally but never seriously considered...
It wasn't considered because Australia was set on buying conventionally powered subs despite that from a sizing, crewing, manufacturing point of view, it was ideal. Hence the Attack class conventionally powered version.

It remains a mystery why, despite having an option to build state of the art nuclear powered subs, probably prior to the 2030s, Morrison threw the whole deal overboard for AUKUS, second hand Virginias, hypothetical subs yet to be designed by the brits, and a massive increase in the US military presence in Australia.
 
It wasn't considered because Australia was set on buying conventionally powered subs despite that from a sizing, crewing, manufacturing point of view, it was ideal. Hence the Attack class conventionally powered version.

It remains a mystery why, despite having an option to build state of the art nuclear powered subs, probably prior to the 2030s, Morrison threw the whole deal overboard for AUKUS, second hand Virginias, hypothetical subs yet to be designed by the brits, and a massive increase in the US military presence in Australia.

in retrospect, what submarine solution do you think Australia should have gone for?
 
in retrospect, what submarine solution do you think Australia should have gone for?
Nuclear powered Suffrens. Difficulty then is that every 5-8 years, they gotta go back to France to be refueled unless/until Oz builds a nuclear shipyard. So you'd actually want more than 12, probably 14-16, to keep the numbers up while boats are being refueled.

But I think the AUKUS deal may be better for Oz in the long run. More industry, a nuclear shipyard in Oz to do the work locally, and all the high-paid highly skilled workers that the supporting industries require.
 
in retrospect, what submarine solution do you think Australia should have gone for?

If nuclear power is still considered an absolute requirement by the RAN then Suffren. It WAS the design selected by the RAN when Morrison blew up the plan, and the design work done already for the Attack class has done the lions share of integrating the AN/BSY-1 combat system into the design.

Refueling of the Suffren class LEU reactors is at around ten year intervals in line with the major overhaul cycle.

I think it's an open question whether they would need to be returned to France for refueling or not. Australia would have a decade to get the facilities together to accomplish the Suffren class' (simplified) refueling process at home after all.
 
The best plan was to change exactly nothing, and stick to conventional Attack design as it was.

The supreme irony being that Attack subs were essentially non-nuclear Barracuda / Suffren. Hence, a bunch of Attacks could, first, reliviate the Collins while partially training Australian crews to the coming Barracudas.
 
There is also the case for a mixed fleet, nuclear / non-nuclear - of otherwise rather similar submarines (since Attack and Barracuda are heavily related in design) : synergies, symbiosis... basically: use the non-nuclear subs for every mission where nuclear power isn't needed, extracting additional life from the most expensive nuclear subs.
 
just catching up to all this, so Australia is insistent on it being nuclear..
besides the Suffren and Virginia, was the Astute considered/offered?
Yes. In fact, before the United States ah, barged aboard the program, the original Anglo-Australian plan was for a Astute-based design with a US supplied combat system to allow full interoperability with the USN. Though as H_K notes, that had evolved into the mostly clean sheet SSNR design just before the Americans came onboard.
 
Last edited:
A longer, more detailed essay by RADM Peter Briggs detailing the issues being faced in Australia, the United States and the United Kingdom in relation to Australia's Collins Class replacement. An excellent breakdown of the issues at hand with AUKUS

 
Nuclear powered Suffrens. Difficulty then is that every 5-8 years, they gotta go back to France to be refueled unless/until Oz builds a nuclear shipyard. So you'd actually want more than 12, probably 14-16, to keep the numbers up while boats are being refueled

I think it's an open question whether they would need to be returned to France for refueling or not. Australia would have a decade to get the facilities together to accomplish the Suffren class' (simplified) refueling process at home after all.

@Scott Kenny Refuelling the Suffrens would have been easy. As pointed out by @jeffb it is a simplified process that can be done concurrently with any docking cycle by opening a hatch in the reactor section. Typically happens every 10 years and doesn’t require a return to the yard that built it. It’s usually done in the SSN’s maintenance yard with just a little extra infrastructure.*

The French SSNs have the highest availability and sea time of any attack subs in the world so would require *fewer hulls* than any other option. Typically the 5 SSNs (with double crews) average 800-1000 sea days per year vs. 600-700 sea days for the RAN’s 6 Collins… in a good year! So 5-6 Suffren SSNs would deliver more capability than what the RAN has today or is expected to have in 2-3 decades.

(Note the French sea days was with their 30 year old Rubis class, and is expected to be even better with the brand new Suffrens with longer operational cycles in between docking/refueling).

* The infrastructure for refueling is a Reactor Access House on rails that runs over the dock and is used to extract the spent fuel rods in a contained environment. The rods are then moved to a temporary storage pool, from where they can be shipped to France or other countries for reprocessing (as this is low enriched uranium, not military grade HEU). There is also additional safety infrastructure (eg. to handle reactor cooling) but this will need to be put in place whether or not the SSNs need to be refueled. IMG_3829.jpeg
 
Last edited:
Haven't bothered with reading all that's been said here about this since last offering my 2¢ (or should it be "centimes" in this case?). One of those story arches that would probably be rejected out of hand if presented as a movie script. But then again our timeline seems to hold an abundance of those.

It's just as well that the French start cranking out (nuclear) Suffrens now whether they be employed at their own, EU's or the universal arsenal of democracies' behest. The more the merrier. What the heck, Macron could just donate some to Australia and christen the first one "Brigitte" to boot. That alone would conveniently explode a few well targeted heads without any escalatory consequences.
 
@Scott Kenny Refuelling the Suffrens would have been easy. As pointed out by @jeffb it is a simplified process that can be done concurrently with any docking cycle by opening a hatch in the reactor section. Typically happens every 10 years and doesn’t require a return to the yard that built it. It’s usually done in the SSN’s maintenance yard with just a little extra infrastructure.*

The French SSNs have the highest availability and sea time of any attack subs in the world so would require *fewer hulls* than any other option. Typically the 5 SSNs (with double crews) average 800-1000 sea days per year vs. 600-700 sea days for the RAN’s 6 Collins… in a good year! So 5-6 Suffren SSNs would deliver more capability than what the RAN has today or is expected to have in 2-3 decades.

(Note the French sea days was with their 30 year old Rubis class, and is expected to be even better with the brand new Suffrens with longer operational cycles in between docking/refueling).

* The infrastructure for refueling is a Reactor Access House on rails that runs over the dock and is used to extract the spent fuel rods in a contained environment. The rods are then moved to a temporary storage pool, from where they can be shipped to France or other countries for reprocessing (as this is low enriched uranium, not military grade HEU). There is also additional safety infrastructure (eg. to handle reactor cooling) but this will need to be put in place whether or not the SSNs need to be refueled.View attachment 762836
Right, but you still absolutely need that refueling infrastructure, no matter how relatively easy the French design makes it.

If Oz doesn't have it, the boats gotta go back to France to have it done. So now you're without the boat getting refueled for an extra 6 months or so for it to go around. (~3months there and another ~3months back).
 
Yes. In fact, before the United States ah, barged aboard the program, the original Anglo-Australian plan was for a Astute-based design with a US supplied combat system to allow full interoperability with the USN. Though as H_K notes, that had evolved into the mostly clean sheet SSNR design just before the Americans came onboard.
Of course what happens with that is Virginias offered but requiring Australian funds to even try to get production up to speed to meet that need.
Which obviously saps any Australian funds towards AUKUS-SSN......

So by dividing Australia's funds the US places Australia and the UK in the bind of not being able to ramp up to meet the schedule. All while waving the temptation to "Just buy more Virginias".

Now considering how China friendly certain factions in the US be.....this is just a win-win here.
Delays.
Schedule pushed back and in doubt.
Australian funds committed to the US, so unavailable for any other option.
Bridges burned with France.
 
Right, but you still absolutely need that refueling infrastructure, no matter how relatively easy the French design makes it.

If Oz doesn't have it, the boats gotta go back to France to have it done. So now you're without the boat getting refueled for an extra 6 months or so for it to go around. (~3months there and another ~3months back).

Agree. Having that infrastructure is extremely useful as it makes construction easier and safer. The fueling of the reactor can be done separately from the sub's reactor compartment construction and testing, and the fuel rod configuration can be tested in a completely separate purpose built facility prior to its installation in the sub.

The SSN-AUKUS approach, by comparison, would see a completed, 'sealed' reactor compartment, already fueled with 93%+ enriched uranium, delivered from the UK and integrated 'live' as it were, into the vessel under construction.

A fully-fueled reactor that would be delivered, via ship one imagines, having been craned into the hold of a specially chartered cargo vessel and probably escorted by RN or RAN warships, around the Cape of Good Hope (if the Houthis are still harassing cargo) and across the Indian Ocean to Adelaide.

I mean, you can see why the existing AUKUS plan is considered very high risk.
 
Agree. Having that infrastructure is extremely useful as it makes construction easier and safer. The fueling of the reactor can be done separately from the sub's reactor compartment construction and testing, and the fuel rod configuration can be tested in a completely separate purpose built facility prior to its installation in the sub.

The SSN-AUKUS approach, by comparison, would see a completed, 'sealed' reactor compartment, already fueled with 93%+ enriched uranium, delivered from the UK and integrated 'live' as it were, into the vessel under construction.

A fully-fueled reactor that would be delivered, via ship one imagines, having been craned into the hold of a specially chartered cargo vessel and probably escorted by RN or RAN warships, around the Cape of Good Hope (if the Houthis are still harassing cargo) and across the Indian Ocean to Adelaide.

I mean, you can see why the existing AUKUS plan is considered very high risk.
I was under the impression that all the AUKUS ships would be built in the UK. Did I miss a memo about Oz building them?
 
You're probably right Foo Fighter. Although I'm not sure whether the first SSN-AUKUS boats are going to the RN or the RAN.
 
You're probably right Foo Fighter. Although I'm not sure whether the first SSN-AUKUS boats are going to the RN or the RAN.
All Aus boats will be built in Australia. The first SSN-AUKUS will be for the RN built in the UK and delivered in the late 2030s. Aus boats will also start build in the 2030s but the first won't be delivered until the early 2040s.
 
All Aus boats will be built in Australia. The first SSN-AUKUS will be for the RN built in the UK and delivered in the late 2030s. Aus boats will also start build in the 2030s but the first won't be delivered until the early 2040s.
Ah, okay, I'm following now.

I knew that the timeline for Oz getting AUKUS boats being so long was what resulted in the lease of Virginia-class boats.
 
All Aus boats will be built in Australia. The first SSN-AUKUS will be for the RN built in the UK and delivered in the late 2030s. Aus boats will also start build in the 2030s but the first won't be delivered until the early 2040s.
Not meaning that UK built boats would be for the Ockers, more that they would gain experience and knowledge while participating in the build of the first two for the UK RN.
 
Not meaning that UK built boats would be for the Ockers, more that they would gain experience and knowledge while participating in the build of the first two for the UK RN.
100%, Australia finished the last Collins in 2003 so there likely won't be a single person with a welding torch on SSN-AUKUS that worked on the Collins program. A steep learning curve...
 
100%, Australia finished the last Collins in 2003 so there likely won't be a single person with a welding torch on SSN-AUKUS that worked on the Collins program. A steep learning curve...
Since Collins sustainment and upgrades are ongoing, that seems overly pessimistic. No one around who worked on the first build maybe, but a lot has happened since then.
 
Since Collins sustainment and upgrades are ongoing, that seems overly pessimistic. No one around who worked on the first build maybe, but a lot has happened since then.
Not really, has been a known issue for the last 20 years in Australian defence especially Navy.

With the Collins submarines, a new company, shipyard and workforce were set up to build them. They turned to maintenance when the build program ended, by which time Cockatoo Island had been closed for over a decade. Early results were not so good, for many reasons.

One factor was that skills had been developed to build the submarines, not to maintain them. It took over a decade and the Coles review before an acceptable outcome was reliably achieved. When Australia started building the air warfare destroyers, after a break of almost 10 years, everybody had to relearn the craft, including Defence, which took time. The fact is, building ships and submarines requires different skills from repairing and maintaining them, even when you built them in the first place.
 
...and now, Collins LOTE problems.




 
100%, Australia finished the last Collins in 2003 so there likely won't be a single person with a welding torch on SSN-AUKUS that worked on the Collins program. A steep learning curve...
Oh, man, that's gonna SUCK!

I saw parts of that while NNNS was trying to get up to speed building Virginias, it took them a long time before they were as good as the folks at EB. The NNNS first boat wasn't completed until after EB completed their second.
 
To me that seems to prove the maintenance of skillset requirement if we are to keep a proper defence of nation industry, wherever we are.
Getting to the point where more whatever is needed and we just cannot, again, strikes me as PPM.
 