- Joined
- 21 January 2015
- Messages
- 11,590
- Reaction score
- 14,864
View: https://twitter.com/nextspaceflight/status/1591970668366925824
View: https://twitter.com/nextspaceflight/status/1591970756287668228
View: https://twitter.com/jeff_foust/status/1591971003269201920
Two issues being watched ahead of Artemis I (both relate to storm damage):
1) LH2 Tail Service Mast umbilical has a suspect electrical connector.
2) Some material has delaminated from the eastern side of the Orion spacecraft.
View: https://twitter.com/nextspaceflight/status/1591970756287668228
The first issue does not sound serious, and they have some redundancy. The second issue will cause the team to reconvene tomorrow for further review.
View: https://twitter.com/jeff_foust/status/1591971003269201920
Mission manager Mike Sarafin: polled go for launch pending one open action (RTV material that came loose where Orion LAS meets up with crew module) as well as issues reviewing storm damage and a faulty electrical connector in the tail service mast umbilical.