Forest Green
ACCESS: Above Top Secret
- Joined
- 11 June 2019
- Messages
- 9,305
- Reaction score
- 16,861
"The Army is providing the first four LTAMDS prototypes to the formation designated as the “first unit equipped” with primary sector capability by December 2023,
— AirPower 2.0 (MIL_STD) (@AirPowerNEW1) August 9, 2023
Once the second phase of testing is complete, the Army will conduct an OA in Q1 FY25" pic.twitter.com/85nkZmfJhT
"The service received the 6 required #LTAMDS OP's from Raytheon and completed CVT a few weeks ago. “That went very well.” Five of the systems are at White Sands Missile Range, New Mexico, and the sixth remains with Raytheon at its Andover, Mass., facility for testing" pic.twitter.com/8PQxk3pTV5
— AirPower 2.0 (MIL_STD) (@AirPowerNEW1) August 9, 2023