My treasures

Michel Van said:
blackkite said:
東京 : Tokyo, 名古屋 : Nagoya, 新大阪 : Shin Osaka
Tokyo-Nagoya : minimum 40minutes(D.C.2027 complete), Nagoya-Shin Osaka : minimum 27minutes(D.C.2045 complete)
So Tokoyo-Shin Osaka : minimum 68-70 minutes. Almost same as jet airliner.


http://museum.jr-central.co.jp/en/
You can see My.Fuji under the test course.


Interesting
will this have same impact as TGV in Belgium France ?
after installation of TGV line between Brussels and Paris, went between two cities the Air-traffic to Zero
Oh! Zero. So the linear motor car line will be our enemy. ;D
 
Just to keep Steve P happy...

The attached was snapped in a pub next to Wright-Pratt. I want one, but Mrs CJ would not agree.

Chris

Pub also sells rather agreeable beer, which came as a surprise to a Scotsman with a jaundiced view of American beer, so two of my treasures from my US trip, a ceiling fan and Yeungling beer.

Chris
 

Attachments

  • ceiling fan.jpg
    ceiling fan.jpg
    281.8 KB · Views: 19
CJGibson said:
... I want one, but Mrs CJ would not agree.

I know this problem ! The only room, where I would be allowed to install it, is my workshop in
the cellar. But there the risk of being decapitated would be a little bit to high ! ::)
 
Hi!
Bottom table shows the relation between Tokyo - Osaka mean velosity v.s. Co2 discharge per seat.

交差誘導線 : (Continuous Type Train Location Detector using )Crossed Inductive Wires
float is not proper,  levitation is correct.
http://www.jiji.com/jc/movie?p=top650-movie02&s=670&rel=y

This L0 type linear motor car still carries the gas turbine generator in order to operate the superconducting magnet carried in the car.
However, it is improved by the system which supplies electric power from the outside of the car by electromagnetic induction in the future.


By the run which recorded 574 km/h, the rail of TGV was damaged violently.
http://www.youtube.com/watch?v=cWZp4p2Ga8Q
 

Attachments

  • linear_motor_car_principal_1.jpg
    linear_motor_car_principal_1.jpg
    228.8 KB · Views: 19
  • linear_motor_car_principal_2.jpg
    linear_motor_car_principal_2.jpg
    209.1 KB · Views: 20
  • Co2 discharge.gif
    Co2 discharge.gif
    13.6 KB · Views: 15
  • speed record.jpg
    speed record.jpg
    146.3 KB · Views: 19
  • linear motor car pic3.jpg
    linear motor car pic3.jpg
    96.4 KB · Views: 21
The speed on cannonball was mach 3, the range was 42km.
 

Attachments

  • Yamato at the bottom of the sea.jpg
    Yamato at the bottom of the sea.jpg
    167.4 KB · Views: 17
  • Yamato final shape in April 1945.jpg
    Yamato final shape in April 1945.jpg
    266.4 KB · Views: 14
  • Zero fighter poiture 2.jpg
    Zero fighter poiture 2.jpg
    219.9 KB · Views: 7
  • Zero fighter picture1.jpg
    Zero fighter picture1.jpg
    67.8 KB · Views: 12
  • Zero fighter.jpg
    Zero fighter.jpg
    90.1 KB · Views: 14
  • img035.jpg
    img035.jpg
    23.5 KB · Views: 12
  • Yamato_46cm_bullet.jpg
    Yamato_46cm_bullet.jpg
    151 KB · Views: 12
Hi! Tokyo station.
 

Attachments

  • Tokyo Station.jpg
    Tokyo Station.jpg
    392.7 KB · Views: 150
blackkite said:
Hi!
Bottom table shows the relation between Tokyo - Osaka mean velosity v.s. Co2 discharge per seat.

交差誘導線 : (Continuous Type Train Location Detector using )Crossed Inductive Wires
float is not proper,  levitation is correct.
http://www.jiji.com/jc/movie?p=top650-movie02&s=670&rel=y

This L0 type linear motor car still carries the gas turbine generator in order to operate the superconducting magnet carried in the car.
However, it is improved by the system which supplies electric power from the outside of the car by electromagnetic induction in the future.


By the run which recorded 574 km/h, the rail of TGV was damaged violently.
By the run which recorded 574 km/h, the rail of TGV was damaged violently.
This is completely untrue. The same train set ran back to the starting point, on the same track, immediately after the record run, and then forth and back twice on the same day, and finally a few days later at speeds up to 542,9 km.h-1 at exactly the same location before it left the test line-section for de-modification. In total trainset 4402 ran more than 730km at speeds above 500km.h-1 on the same 70km track section without any damage to the track.
 
Hi!
http://ajw.asahi.com/article/behind_news/social_affairs/AJ201205060013

FGT shinkansen will begin operation in2022 at Hakata Nagasaki route.
From Shintosu to Takeo onsen is narrow gauge rail.
 

Attachments

  • Kyushu_Shinkansen_map_Kagoshima_route_and_Nagasaki_route.png
    Kyushu_Shinkansen_map_Kagoshima_route_and_Nagasaki_route.png
    220.5 KB · Views: 252
  • How_the_train_changes_its_gauge.jpg
    How_the_train_changes_its_gauge.jpg
    248.8 KB · Views: 268
  • 001.jpg
    001.jpg
    199.7 KB · Views: 280
  • m0017059328.jpg
    m0017059328.jpg
    99.5 KB · Views: 284
  • large-535235f22b6e8.jpg
    large-535235f22b6e8.jpg
    341.4 KB · Views: 302
http://www.youtube.com/watch?v=Vbzx7p84YtY
 
http://www.youtube.com/watch?v=zvEK3wEUuxs
 
ANA Boing 747 last flight with A380.

https://www.youtube.com/watch?v=lb0sYX0xHOA
 
Hi Hiroshime prefecture.
http://www.youtube.com/watch?v=hhAcMQLXEDo
 
http://hiroshima-welcome.jp/

Slide show.
http://hiroshima-welcome.jp/ss/
 
Great footage ! The strictly peaceful event aside, it can give an idea, what it may be
like to fly through intense AA fire .
 
Hi! Rin Takanashi.
https://www.youtube.com/watch?v=u6i08BN2KPI
 

Similar threads

Please donate to support the forum.

Back
Top Bottom