Lockheed Martin F-35 Lightning II Joint Strike Fighter (JSF)

http://aviationweek.com/defense/f-35-f-16-noise-difference-small-netherlands-study-shows?NL=AW-05&Issue=AW-05_20160601_AW-05_975&sfvc4enews=42&cl=article_2&utm_rid=CPEN1000000230026&utm_campaign=6085&utm_medium=email&elq2=ae14c63ce0bf4291a33d4e27d974adcf
 
For those who can't get into that article.

http://www.defensenews.com/story/defense/air-space/2016/06/01/f-35-f-16-dutch-netherlands/85238616/
 
http://nationalinterest.org/blog/the-buzz/f-35-joint-strike-fighter-more-just-stealth-its-flying-16560
 
Pentagon Anticipates Awarding F-35 Contract In First Quarter of 2017
(Source: Defense Insider; posted June 20, 2016)

The Pentagon recently announced it anticipates awarding a contract to Lockheed Martin in the first quarter of calendar year 2017 for Joint Strike Fighter Lots 12-14.

The proposed contract actions will provide for 100 F-35A conventional-takeoff-and-landing jets, 26 F-35B short-takeoff-and-vertical-landing aircraft and six F-35C carrier variant jets in Lot 12.

Lot 13 includes 104 F-35As, 26 F-35Bs and 12 F-35Cs.

Lot 14 provides for 88 F-35As, 30 F-35Bs and 18 F-35Cs, according to a June 16 presolicitation notice posted on the Federal Business Opportunities website.

"Contract actions will provide for long lead time materials, parts, components, and effort; Ancillary Mission Equipment (AME); Production Non-Recurring (PNR) activities to support the F-35 production ramp rate including tooling, test equipment, production aids, production equipment, and support labor; technical, financial and administrative data; and proposal preparation," the notice reads.

It adds: "Contract actions will also provide for associated sustainment support including spares, support equipment, non-recurring autonomic logistics sustainment activities, training, Autonomic Logistics Information Systems (ALIS) hardware, depot activation, Performance Based Logistics (PBL) operations, and maintenance for all F-35A, F-35B, and F-35C aircraft; and all efforts associated with the procurement of hardware for and sustainment of Joint Reprogramming Enterprise (JRE).

Note that the numbers here total up to another 410 aircraft over roughly 3yrs.
 
http://www.defensenews.com/story/defense/air-space/air-force/2016/06/21/f35-software-mountain-home-deployment/86191386/?utm_source=twitterfeed&utm_medium=twitter
 
F-35 Passes Deployment Test

The commander of the first combat F-35A unit said Tuesday the jet did well at its “graduation” deployment test, and that he’ll be able to recommend declaring it ready for initial operational capability “very soon.” Col. David Lyons, commander of the 388th Fighter Wing at Hill AFB, Utah, said a June 6-17 deployment of seven F-35As to Mountain Home AFB, Idaho, “proved” the fighter can deploy, operate, and fight. During the evaluation, the Autonomic Logistics and Information System (ALIS), “performed the way it was supposed to,” and he reported “zero” problems with the jet’s 3i software, with no need to reboot it. “We flew 88 of 88 scheduled sorties,” Lyons said, flying both alongside and against F-16s and F-15Es in a variety of scenarios against a representative heavy air defense system. The F-35s flew close air support, suppression and destruction of enemy air defenses, and overall scored hits with 39 of 40 GBU-12 and GBU-31 inert bombs—one miss was due to a hardware problem with the bomb—while achieving a 92.3 percent mission capable rate. Lyons said he sees no problem with declaring IOC “on time,” even though there are still a few blocks yet to check, such as an eight-ship generation and some pilot certification. “Then we’ll be ready to make the recommendation,” Lyons said, although declaring IOC is the purview of Air Combat Command chief Gen. Hawk Carlisle, and Lyons said there may be “programmatic” considerations that could affect the timing. Asked if he thinks the jet is ready for combat, Lyons said, “yes.”
 
Even if they decide not to wait for all of ALIS 2.02 they still have to wait for the latest version that is planned for delivery in early September. I think by mid September they would have declared IOC with the final ALIS 2.02 capability accepted later in November.

ClJs0sqUsAIyrKb.jpg


ClfXKBnUoAABSkD.jpg
 
F-35 Engine Upgrade Gathers Pace

As Pratt & Whitney nears completion of the extensive F135 system development and demonstration (SDD) program for the F-35 Joint Strike Fighter engine, the company is revealing new details of a proposed upgrade that could cut fuel burn by as much as 7% on aircraft entering service by the early 2020s. The upgrade package builds on a fuel-burn reduction technology effort driven by the U.S. Navy and an improved compressor developed by Pratt. Initial test results have been positive and are ...

http://m.aviationweek.com/defense/f-35-engine-upgrade-gathers-pace
 
F-35 PEO: Joint Strike Fighter To Escape Concurrency 'Rut' Around 2018

The head of the F-35 Joint Strike Fighter program expects the $400 billion fighter jet program to lift itself out of the concurrency "rut" by about 2017 or 2018 as the number of aircraft and engine faults discovered during developmental testing continues to decline.

Last week, the Government Accountability Office warned that the costs associated with retrofitting already-built Joint Strike Fighters will likely increase as the Defense Department ramps up procurement quantities over the next five years. The services plan to purchase another 339 aircraft through 2019 at a cost of $54 billion, despite 40 percent of the developmental test program remaining.

Speaking at the Norwegian-American Defense Conference in Washington April 17, Lt. Gen. Christopher Bogdan said the concurrency overlap and the number of new discoveries has come down significantly over the last few years, but conceded that the 130 airplanes already in the field will all need to be retrofitted at some point.

"This program started with an immense amount of concurrency," the general said. "We are going to find other things wrong with this airplane because we have testing left. Our job is to figure out how, once we find those things, we get it into the production line and stop building airplanes that are not appropriate for what we found -- and then putting a program in place to get all of the other airplanes out in the field upgraded to that new capability or to remove those deficiencies."

"We feel by about 2017, 2018 we will be out of this rut in which we are building airplanes that now have to be retrofitted because of a new discovery," he continued.

Bogdan explained that the cost of concurrency, $1.7 billion to date, will not be borne solely by the United States, but that international partners will also pay their share depending on an agreed retrofit plan tailored to their needs. His comments come as the first Norwegian F-35, AM-1, makes its way down the assembly line at Fort Worth, TX. The first two Norwegian jets will be delivered in 2015 as the European partner works toward achieving initial operational capability in 2019.

"Ultimately, it will be the partner's decision as to whether they want to modify their airplanes and up to what level," he said. "We will create a plan that allows every single airplane eventually by 2018 to have the full hardware and full software capability that we promised. We believe all the partners will fund it to that level, but they don't have to. We will keep the airplanes in a configuration they desire, but that's a bill we all end up paying."

Earlier in his presentation, Bogdan said the F-35 JSF program is big, complicated and sometimes very messy, but "this is not the same program it was five years ago."

Bogdan described Norway as a "model citizen" on the program and the only partner to bring its procurement profile of 52 fighter jets forward. The country was recently selected to host a heavy engine maintenance depot to service jets in Europe, and Bogdan said there would be many more opportunities for Norway and the wider European defense industry to participate in future sustainment work.

According to the general, European partners can expect to see a suite of new requests for proposals come out in the next two to three years as the program delivers more aircraft and moves closer to its initial operational capability milestones.

"The only two things that we've actually assigned so far are heavy airframe depot and heavy engine depot," he said. "In the future, over the next two to three years, we'll start discussing with the partnership how we'll set up capabilities to repair all sorts of systems: landing gear, hydraulics, avionics, support equipment, warehousing, and setting up the supply chain. -- James Drew

DoD doesn't want to block purchase yet since the code has sucked and ALIS has been a turd.

Pentagon anticipates awarding F-35 contract in first quarter of 2017


he Pentagon recently announced it anticipates awarding a contract to Lockheed Martin in the first quarter of calendar year 2017 for Joint Strike Fighter Lots 12-14.

The proposed contract actions will provide for 100 F-35A conventional-takeoff-and-landing jets, 26 F-35B short-takeoff-and-vertical-landing aircraft and six F-35C carrier variant jets in Lot 12.

Lot 13 includes 104 F-35As, 26 F-35Bs and 12 F-35Cs. Lot 14 provides for 88 F-35As, 30 F-35Bs and 18 F-35Cs, according to a June 16 presolicitation notice posted on the Federal Business Opportunities website.

"Contract actions will provide for long lead time materials, parts, components, and effort; Ancillary Mission Equipment (AME); Production Non-Recurring (PNR) activities to support the F-35 production ramp rate including tooling, test equipment, production aids, production equipment, and support labor; technical, financial and administrative data; and proposal preparation," the notice reads, adding: "Contract actions will also provide for associated sustainment support including spares, support equipment, non-recurring autonomic logistics sustainment activities, training, Autonomic Logistics Information Systems (ALIS) hardware, depot activation, Performance Based Logistics (PBL) operations, and maintenance for all F-35A, F-35B, and F-35C aircraft; and all efforts associated with the procurement of hardware for and sustainment of Joint Reprogramming Enterprise (JRE)."
 

Attachments

  • F-35 Concurrency.png
    F-35 Concurrency.png
    1,010.8 KB · Views: 328
bring_it_on said:
Pentagon anticipates awarding F-35 contract in first quarter of 2017


he Pentagon recently announced it anticipates awarding a contract to Lockheed Martin in the first quarter of calendar year 2017 for Joint Strike Fighter Lots 12-14.

The proposed contract actions will provide for 100 F-35A conventional-takeoff-and-landing jets, 26 F-35B short-takeoff-and-vertical-landing aircraft and six F-35C carrier variant jets in Lot 12.

Lot 13 includes 104 F-35As, 26 F-35Bs and 12 F-35Cs. Lot 14 provides for 88 F-35As, 30 F-35Bs and 18 F-35Cs, according to a June 16 presolicitation notice posted on the Federal Business Opportunities website.

"Contract actions will provide for long lead time materials, parts, components, and effort; Ancillary Mission Equipment (AME); Production Non-Recurring (PNR) activities to support the F-35 production ramp rate including tooling, test equipment, production aids, production equipment, and support labor; technical, financial and administrative data; and proposal preparation," the notice reads, adding: "Contract actions will also provide for associated sustainment support including spares, support equipment, non-recurring autonomic logistics sustainment activities, training, Autonomic Logistics Information Systems (ALIS) hardware, depot activation, Performance Based Logistics (PBL) operations, and maintenance for all F-35A, F-35B, and F-35C aircraft; and all efforts associated with the procurement of hardware for and sustainment of Joint Reprogramming Enterprise (JRE)."

Errr...check back a page or so ;)
 
This thread is as good a place as any for a stealth story I guess:

http://aviationweek.com/defense/measuring-stealth-technologys-performance?NL=AW-19&Issue=AW-19_20160628_AW-19_313&sfvc4enews=42&cl=article_1&utm_rid=CPEN1000000230026&utm_campaign=6325&utm_medium=email&elq2=19c704bffde548bfa52e12819fd86cad

At the detection ranges for F-35/22 carrying more CUDAs is a very viable option over AMRAAM.
 
The U.K. Prepares for the F-35

http://m.aviationweek.com/defense/uk-prepares-f-35#slide-0-field_images-1471101
 
http://www.telegraph.co.uk/business/2016/06/22/raf-wont-be-able-to-repair-kit-on-f-35-jets---even-though-it-was/
 
BAE, Northrop Partner With UK Agency for F-35 Bid

DECA’s involvement is, in essence, mandated due to US government insistence that some avionics repairs on the jet here are only undertaken by UK government employees.
“The fact is some repairs will be ring-fenced between industry and government," according to an executive, who spoke on condition of anonymity. "That is the basis on which the aircraft has been bought.”
The MoD spokesman did not respond to a question about whether there is a government-eyes-only lock on the repair and overhaul of certain F-35 avionics.

http://www.defensenews.com/story/defense/air-space/2016/06/29/uk-f35-lightning-jet/86505282/
 
VMA-211 to Transition to F-35B Joint Strike Fighter Squadron
(Source: US Marine Corps; posted June 27, 2016)

MARINE CORPS AIR STATION YUMA, Ariz. --- A re-designation and change of command ceremony for Marine Attack Squadron (VMA) 211 is scheduled to be conducted Thursday at 8:30 a.m.

The squadron is scheduled to transition from the AV-8B Harrier to the F-35B Lightning II Joint Strike Fighter. The squadron will be re-designated from VMA-211 to Marine Fighter Attack Squadron (VMFA) 211. A change of command ceremony is also scheduled where Lt. Col. William Maples will relinquish command to Lt. Col. Chad Vaughn.

The squadron flew its final flights with the AV-8B Harrier May 6 and received its first two F-35B aircraft May 9.

The F-35 Joint Strike Fighter is a supersonic, multi-role, multi-service aircraft that represents a quantum leap in air dominance capability. It combines next-generation fighter characteristics of radar-evading stealth, supersonic speed, fighter agility and advanced logistical support with the most powerful and comprehensive integrated sensor package of any fighter aircraft in history to provide unprecedented lethality and survivability.

The AV-8B Harrier was designed to attack and destroy surface and air targets, escort helicopters, engage in air-to-air defense, provide reconnaissance and apply offensive and defensive support with its arsenal of missiles, bombs and an onboard 25 mm cannon.

-ends-
 
For the first time F-35s have arrived on UK soil.

https://www.engadget.com/2016/06/29/f-35-completes-first-transatlantic-flight-on-delivery-to-uk/
 
https://www.youtube.com/watch?v=TdP_LoqDU2Q

https://www.youtube.com/watch?v=vUCrTP4xqiQ
 
F-35s have arrived on UK
 

Attachments

  • UKF35B4.jpg
    UKF35B4.jpg
    236.1 KB · Views: 454
  • UKF35B1.jpg
    UKF35B1.jpg
    139.5 KB · Views: 435
  • UKF35B2.jpg
    UKF35B2.jpg
    28.4 KB · Views: 426
  • UKF35B3.jpg
    UKF35B3.jpg
    154.2 KB · Views: 423
Some great pics.

Around 8 last night I heard a loud aircraft, looked out the window and an F-35B popped out of the clouds right over our house.

After studying, writing and teaching about ASTOVL for twenty years it put a smile on my face. It would have been bigger if it had been a P.1216 of course.... ;D
 
http://nationalinterest.org/blog/the-buzz/us-air-force-pilot-the-f-35-stealth-fighter-the-worlds-best-16790
 
DOD: RAND revises potential F-35 'block-buy contract' savings downward to $2 billion

A notional three-year Joint Strike Fighter "block-buy contract" between the United States and foreign buyers could net $2 billion in savings, according to a revised assessment of the potential agreement that is lower than a previous $3 billion tally but also accounts for reduced U.S. military participation in such a deal.

RAND Project Air Force has updated an assessment the F-35 joint program office commissioned to explore the possibility of a block-buy contract beginning as soon as fiscal year 2018 for low-rate production lots number 12, 13 and 14, according to Pentagon officials.

"RAND completed the first of a series of cost savings assessments for LOT 12-14 Block Buy," Mark Wright, a spokesman for Pentagon acquisition executive Frank Kendall, said in a June 30 statement to Inside Defense. "Estimated savings in excess of $2 billion were possible as a result of allowing the contractors to utilize Economic Order Quantity purchases, enabling suppliers to maximize production economies of scale through batch orders for those three lots of aircraft."

The Defense Department plans to use these updated figures in discussions this summer with international F-35 partners and foreign military customers to craft options for a collective buy, according to Wright.

DOD and international F-35 customers "will be discussing a potential series of Block Buy options this summer," he added.

The Pentagon, which has been considering the possibility of a three-year JSF multiyear deal beginning with the 12th low-rate production lot in FY-18, is now considering the 13th low-rate production batch in FY-19 for the start, according to DOD officials.

Still, the notional F-35 block-buy contract would allow F-35 partners and foreign military sales customers, such as Israel, Japan, and South Korea, to participate in a block-buy contract that would begin with low-rate initial production lot 12. The United States would then become a party to the contract for Lots 13 and 14, according to Pentagon officials.

Pentagon officials told Congress in April that a three-year block buy beginning in FY-18 "would achieve significant program costs savings by allowing the contractors to utilize economic order quantity purchases, enabling suppliers to maximize production economies of scale through batch orders."

The original RAND assessment found DOD could net savings between $2.5 billion and $3 billion by providing a total of 4 percent economic-order-quantity funding to selected suppliers for a three-year block-buy contract beginning in FY-18 that included the U.S. military and foreign buyers.

Lawmakers, including Senate Armed Services Committee Chairman John McCain (R-AZ), have raised concerns about the efficacy of committing to a block-buy deal while a program is still in development. A block-buy contract is similar to a multiyear contract, but not subject to statutory requirements, such as the need to establish a stable design.

McCain publicly warned the Pentagon in April that Congress was not "likely to entertain a 'block-buy' or other multiyear procurement schemes until the initial operational test and evaluation is completed, and a positive milestone decision is made to commence full rate production, both of which I understand are scheduled to occur in fiscal year 2019."

The revised RAND estimate of $2 billion savings would account for the U.S. military joining a notional block-buy contract in FY-19.

The Air Force, Navy and Marine Corps plan to buy a total of 232 F-35 aircraft between FY-18 and FY-20. According to the F-35 Selected Acquisition Report, dated December 2015 and sent to Congress in March, the Pentagon plans to spend $32.2 billion to buy these aircraft and engines during this three-year window, a sum that assumes block-buy savings of $2.6 billion for the aircraft and $1 billion for the engine.
 
Testing report for F-35 Hard to find ways to test such an advanced aircraft against 4th Gen fighters

http://www.dtic.mil/ndia/2016Test/OT&EPanel.pdf
 
https://news.usni.org/2016/06/30/20458

2nd USMC squadron
 
The Lockheed Martin’s F-35’s newest snag doesn’t come from a technological issue, but an international policy problem, according to the director of the US Air Force’s F-35A Integration Office.

https://www.flightglobal.com/news/articles/sharing-secret-f-35-data-gives-usaf-new-problem-426884/
 
I can't find a high res version of this. Source is UK MOD website.
 

Attachments

  • F35 Over HMS QE.jpg
    F35 Over HMS QE.jpg
    31.3 KB · Views: 241
Awesome feature:

https://images.google.com/imghp?hl=en&gws_rd=ssl
 

Attachments

  • F-35 & Carrier.jpg
    F-35 & Carrier.jpg
    297.8 KB · Views: 123
US Marine Corps F-35s Cleared for Farnborough

http://www.defensenews.com/story/defense/show-daily/farnborough/2016/07/05/f35-riat-farnborough-validation-flight-fairford/86711318/
 
sferrin said:
Awesome feature:

https://images.google.com/imghp?hl=en&gws_rd=ssl
Interesting to see the soot stain that runs from the port side of the spine on both aircraft and back.

It appears to originate from this exhaust port that sits just below and to the port side of the distributed aperture system (DAS) window aft of the canopy, and between the door for the lift fan and the auxiliary inlet doors. Any ideas as to what exhausts from this location? Here's a high resolution photo of an F-35B (BF-05) taking off from USS Wasp (LHD-1) that illustrates it pretty well.
http://www.sldinfo.com/wp-content/uploads/2012/07/F-35B-Wasp.jpg
 
Boxman said:
Interesting to see the soot stain that runs from the port side of the spine on both aircraft and back.

Both Bs in that pick have it and that vent is unique to the B.

Here is an earlier shot

RmycEFs.png
 
SpudmanWP said:
Boxman said:
Interesting to see the soot stain that runs from the port side of the spine on both aircraft and back.

Both Bs in that pick have it and that vent is unique to the B.

Here is an earlier shot

RmycEFs.png
Thanks. I wonder what it is venting at that location? A sooty exhaust of some sort (or maybe something else like a lubricant)? I wonder about its origin (perhaps the lift-fan clutch/gearbox?) and composition.
 

Similar threads

Please donate to support the forum.

Back
Top Bottom