Reply to thread

TomS gets a gold star. B)


The original UCLASS RFP date was  fall 2014.




Why was Boeing so upset when UCLASS was delayed in 2014, 2015 and eventually terminated in 2016?




I'm not sure what part of "blowing the dust off the UCLASS vehicle in storage the last few years " some people don't understand?  This vehicle was probably fully designed and possibly mostly built before there even was a MQ-25 program.


Boeing resurrected the partially built X-45C as Phantom Ray a couple of years later, why wouldn't they do the exact smae with their UCLASS?


Back
Top Bottom