Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Normal
Greetings All -Boeing Vertol was also involved in the initial phases of the ACAP program. I have a copy of Volume I - Preliminary Design - Part I dated December 1981 and I'll post drawings from the report in the order they are presented in the report.The design process started with the design of three composite helicopter airframes - Best Structure, HEI-T Ballistic Tolerant and Low Radar Cross Section - and all used the Bo-105's dynamic components.Enjoy the Day! Mark
Greetings All -
Boeing Vertol was also involved in the initial phases of the ACAP program. I have a copy of Volume I - Preliminary Design - Part I dated December 1981 and I'll post drawings from the report in the order they are presented in the report.
The design process started with the design of three composite helicopter airframes - Best Structure, HEI-T Ballistic Tolerant and Low Radar Cross Section - and all used the Bo-105's dynamic components.
Enjoy the Day! Mark