Grey Havoc

ACCESS: USAP
Senior Member
Joined
9 October 2009
Messages
20,838
Reaction score
11,815
I think some of the photos in question may have been previously posted in a thread a few months back, but haven't being able to find the one in question so far.



(First two links may be paywalled)







Is the Zhou-class another name for the Type 095 / 09-V SSN?
 
Last edited:
If a PLA:N SSN sunk during fitting out after launch that's something they'd want to try and cover up.
 
If a PLA:N SSN sunk during fitting out after launch that's something they'd want to try and cover up.

and typical draft for SSN is something like 7-8 meters. While Wuchang shipyard which located in Yangtze river only able to support submarine with 5-6 meter draft.


Chinese Type-039 diesel-electric sub which also made there have draft of something like 5.4 meter, If it sunk pierside you would expect at least the conning tower would still be on surface.
 
Is there any reason why suddenly China move SSN production to Wuhan ? Instead of usual Bohai Shipyard ?
Glass half full:
Could be they wanted to develop a new capability at that yard.
Could be they wanted to tinker with a prototype without disrupting the current nuke production line.
Glass half empty:
Could be political, could be corruption.
 
Glass half full:
Could be they wanted to develop a new capability at that yard.
Could be they wanted to tinker with a prototype without disrupting the current nuke production line.
Glass half empty:
Could be political, could be corruption.

or fake news.
 
This is unlikely to be a serious issue, but rather a procedural workflow for submarine transit operations.
 

Similar threads

Please donate to support the forum.

Back
Top Bottom