Reply to thread

Not true.

Saab was told their JAS 39E pre series model was not mature enough for the evaluation, i.e. the Swiss AF required a ready into service aircraft for the evaluation. Saab could not provide that, so they decided to quit.

In the first tender from 2011, the F-35 was not a participant at all. That program was to replace the F-5E fleet so requirements were lower.


Back
Top Bottom