Reply to thread

First application to make production is a revised Fairbanks Morse power generation engine.  Design/engineering was provided by Achates to replace an early generation opposed piston design that Fairbanks Morse had been producing since it was founded.


[MEDIA=youtube]R2xJgXbbuN0[/MEDIA]

View: https://www.youtube.com/watch?v=R2xJgXbbuN0



Interview with an Achates exec updating where the company is in bringing other projects to production.


[MEDIA=youtube]8qmAlnIh4mk[/MEDIA]

View: https://www.youtube.com/watch?v=8qmAlnIh4mk


Back
Top Bottom