Reply to thread

NG may be building the aircraft in a different manner since they do not have a principal subcontractor (like Boeing), they probably get empty composite structural sections from their suppliers then the systems/subsystems are installed. The B-2 as an example, the Boeing and LTV sections were completely stuffed then shipped to Plant 42 where they were assembled in the production jigs.


Back
Top Bottom