Can anyone tell me what are the FORMAL definitions of (and differences between)...
"Fitted for but not with"
and
"Space and weight reserved for..."
...as pertains to warship design?
The first sounds to me like a system whose wiring, plumbing, etc,. have already been installed and for which fire control handling exists, but which requires only to be lifted in and bolted down on the dockside, with a minimum of structural alteration. Examples: Harpoon or Tomahawk launch boxes, Phalanx CIWS.
The second sounds to me like a system which must be incorporated into future new builds of the class, or which requires major dockyard installation (as in a mid-life refit). This might include (as a hypothetical example) removing a full ASROC system (with its below deck launcher) and installing a Mk26 system in its place, or removing a 5" Mk42 gun turret and putting a Mk11 or Mk13 Tartar launcher into its place (together with installation of the requisite fire-control systems and illuminators), with likely hull volume and (especially) topweight considerations having been taken into account at the time of hull design.
Correction and clarification are invited.
"Fitted for but not with"
and
"Space and weight reserved for..."
...as pertains to warship design?
The first sounds to me like a system whose wiring, plumbing, etc,. have already been installed and for which fire control handling exists, but which requires only to be lifted in and bolted down on the dockside, with a minimum of structural alteration. Examples: Harpoon or Tomahawk launch boxes, Phalanx CIWS.
The second sounds to me like a system which must be incorporated into future new builds of the class, or which requires major dockyard installation (as in a mid-life refit). This might include (as a hypothetical example) removing a full ASROC system (with its below deck launcher) and installing a Mk26 system in its place, or removing a 5" Mk42 gun turret and putting a Mk11 or Mk13 Tartar launcher into its place (together with installation of the requisite fire-control systems and illuminators), with likely hull volume and (especially) topweight considerations having been taken into account at the time of hull design.
Correction and clarification are invited.