Reply to thread

IIRC in regards to Boeing's proposal to build ten X-51As instead of the originally four was to not only take into account loss of X-51As before completing their test-flights (The DoD really needs to stop being risk adverse) but any left over after the test objectives were met could be used to fly simulated attack missions to get additional data.


Back
Top Bottom