Reply to thread

True, but I was assuming for the sake of maximum possible fleet size that the H-6K was an even higher priority program than the Y-20 and Il-76 programs. I wouldn't be surprised though, if in actuality the KJ-2000 program has an equal or higher priority to the H-6K.


Back
Top Bottom