In theory, FFLIT has only just passed its RFI stage (amended to close 31 Dec 2024 from original 28 Aug 2024). In other words, the FFLIT Project is already lagging behind its 2021 deadlines. [1] And, perhaps, that is why so much public fuss is being made over selecting the only plausible candidate for project advisors?Project requirements will be partially revealed once we get to the RfP stage (although, as contracted services are a part of FFLIT, there will be contractor performance-related SOWs later as well). In the meantime, probably only DAR 5 personnel are privy to the technical requirement details. (As the folks responsible for both fighter- and trainer-related issues, I'd say that the Directorate of Air Requirements 5 is particularly well-suited to dealing with FFLIT.)________________________________[1] When the FFLIT Project was announced in 2021, it was anticipated that options analysis and the definition phase would be underway by 2023/2024. At this rate, I can't see FFLIT Implementation beginning on schedule by sometime next year.
In theory, FFLIT has only just passed its RFI stage (amended to close 31 Dec 2024 from original 28 Aug 2024). In other words, the FFLIT Project is already lagging behind its 2021 deadlines. [1] And, perhaps, that is why so much public fuss is being made over selecting the only plausible candidate for project advisors?
Project requirements will be partially revealed once we get to the RfP stage (although, as contracted services are a part of FFLIT, there will be contractor performance-related SOWs later as well). In the meantime, probably only DAR 5 personnel are privy to the technical requirement details. (As the folks responsible for both fighter- and trainer-related issues, I'd say that the Directorate of Air Requirements 5 is particularly well-suited to dealing with FFLIT.)
________________________________
[1] When the FFLIT Project was announced in 2021, it was anticipated that options analysis and the definition phase would be underway by 2023/2024. At this rate, I can't see FFLIT Implementation beginning on schedule by sometime next year.