.

Whenever they produce enough HS-18 is when its possible to repurpose liquid fuel rocket engines for space launch vehicles.
Whatever problems Chollima-1 type SLV had have been resolved thus could have consistent monthly satellite launch schedule.
Alternatively they could aim to develop a space launch vehicle that is capable of placing up to 8 tons into low earth orbit.
 

Similar threads

Please donate to support the forum.

Back
Top Bottom