I know this is a well covered subject but I was wondering if there is anywhere an RN document from 1965 or 1966 showing what its planned 1975 or so carrier fleet was supposed to look like.
Based on what has been posted here already here is a stab at what I think was intended
Fleet Carriers
1 CVA 01 type (Queen Elizabeth)
1 Audacious type (Eagle)
The air groups for the above would have resembled that actually deployed in Ark Royal in 1975
(1sqn Phantom 1 Sqn Buccaneer, Gannet AEW/COD , Sea King ASW Wessex SAR)
Hermes as also planned to continue in service. As far as I can find it was only planned to operate 1 or 2 squadrons of Bucaneers from this ship, with supporting helos. I suppose the squadrons would come from the Eagle/QE who would then operate 2 Phantom squadrons. Presumably Hermes was not expected to operate on its own.
Had AFVG or an equivalent been developed for service from 1980 or so, Hermes could have operated into the 80s as a mixed carrier again, with QE. Eagle would leave service as soon as CVA02 (Duke of Edinburgh) entered service in 1980-2
The Commando Ship and Helicopter cruiser force was presumably planned to be Bulwark/Albion and the three Tiger class. Replacement ships were being developed to be ordered once CVA 01 was out of the way and before CVA 02 main costs.
I assume this is what the 1965 plans envisaged. It is not hard to see why it was too much for a strapped British budget.
Based on what has been posted here already here is a stab at what I think was intended
Fleet Carriers
1 CVA 01 type (Queen Elizabeth)
1 Audacious type (Eagle)
The air groups for the above would have resembled that actually deployed in Ark Royal in 1975
(1sqn Phantom 1 Sqn Buccaneer, Gannet AEW/COD , Sea King ASW Wessex SAR)
Hermes as also planned to continue in service. As far as I can find it was only planned to operate 1 or 2 squadrons of Bucaneers from this ship, with supporting helos. I suppose the squadrons would come from the Eagle/QE who would then operate 2 Phantom squadrons. Presumably Hermes was not expected to operate on its own.
Had AFVG or an equivalent been developed for service from 1980 or so, Hermes could have operated into the 80s as a mixed carrier again, with QE. Eagle would leave service as soon as CVA02 (Duke of Edinburgh) entered service in 1980-2
The Commando Ship and Helicopter cruiser force was presumably planned to be Bulwark/Albion and the three Tiger class. Replacement ships were being developed to be ordered once CVA 01 was out of the way and before CVA 02 main costs.
I assume this is what the 1965 plans envisaged. It is not hard to see why it was too much for a strapped British budget.